Integrated design

Integral design – because the whole is more than the sum of its parts

We combine architecture, structural engineering, MEP, fire protection and infrastructure into one integrated service. Our projects are led by experienced project managers who coordinate all disciplines across the entire design process – giving clients a single point of contact.

We work in interdisciplinary teams and design in a digital model. We continuously develop our BIM methodology and use it to strengthen our integrated collaboration.

By working together – both digitally and in person – we significantly increase efficiency, reduce handoff losses and minimize design and coordination errors.

Beyond our core disciplines, we bring in process and equipment planners, logistics specialists and external experts early. This ensures all design topics are integrated into one consistent, cross-disciplinary overall plan.

Our methods

Structure & responsibility
  • Central project leadership (single point of responsibility)
  • Interdisciplinary project teams
  • Cross-location resource and know-how management recommendations and actions as needed
Digital tools & models
  • BIM-based integration models
  • Common Data Environment (CDE) as the central data source
  • Model-based coordination and clash detection
Processes & collaboration
  • Concurrent engineering (parallel design)
  • Standardized processes for managing information
  • Phase- and model-based information requirements
  • Coordination and integration loops
  • Clearly defined decision and approval processes
Know-how & Learning
  • Cross-location knowledge management
  • With best practices, industry know-how and lessons learned
  • Industry- and project-specific standards
  • Holistic employee development through technical, methodological and interpersonal training

Your benefit

More efficiency – shorter timelines

Parallel, interdisciplinary work across all disciplines reduces rework cycles, eliminates waiting time and speeds up decisions throughout the design process.
Prevent design errors early 

Integrated collaboration in a shared model makes inconsistencies between disciplines visible early. Conflicts are systematically identified and resolved before implementation.  
Clear responsibility and reduced complexity

We approach our projects hollistically – from day one. At BHM, Integrated design combines technical and industry expertise, leadership and digital methodes to deliver measurable value for our clients.
We approach our projects holistically – from day one. At BHM, Integrated design combines technical and industry expertise, leadership and digital methods to deliver measurable value for our clients.
Christian Monz
Managing Director Feldkirch

Frequently asked questions about
integrated design and BIM

What do we mean by integrated design at BHM?

Integrated design means that architecture, structural engineering, building systems and infrastructure are coordinated from the outset as a single, integrated service. All disciplines work in parallel within interdisciplinary teams under centralized project leadership in order to maximize efficiency, quality and safety in complex construction projects.

What are the benefits of integrated design?

Integrated design minimizes interface losses, identifies design errors early and shortens project timelines. Clients benefit from clear accountability, efficient coordination and measurable value throughout the entire design process.

What is BIM (Building Information Modeling)?

BIM is a digital building information model that connects architecture, structural engineering, building systems, and other disciplines. BIM enables model-based, interdisciplinary collaboration, reduces errors and increases efficiency on large projects.

How does BIM support integrated design?

BIM creates a shared 3D model for all disciplines in which conflicts can be identified and resolved early. It improves transparency, design accuracy and coordination among architecture, engineering and infrastructure.

What’s the difference between BIM and a digital twin?

BIM provides a static, intelligent building model with geometry, materials, cost data and schedule information. A digital twin builds on this and uses real-time data, monitoring and simulation for operations and life-cycle management.

How is BIM used in industrial and infrastructure projects?

In these types of projects, BIM enables early simulation of all technical systems, from piping and energy supply to transportation and logistics systems. This reduces rework, optimizes cost and construction schedules and identifies conflicts between disciplines early.

Which digital tools does BHM use for integrated desgin?

BHM works with BIM-based integration models and a Common Data Environment (CDE). Model-based coordination and clash detection ensure that all disciplines access current, approved data and that conflicts are resolved at an early stage.

How does collaboration and process management work at BHM?

Specialized engineering services are developed in parallel using concurrent engineering. Standardized processes, integration loops and clear approval milestones reduce errors, ensure model quality and accelerate decision-making on complex construction projects.

What role does central project leadership (single point of responsibility) play?

Central project leadership manages all disciplines and partners, consolidates decisions and handles escalations. Clients have a single point of contact, which significantly simplifies coordination.

How does BHM develop its know-how in integrated design?

BHM builds its expertise in integrated design through cross-location knowledge management, best practices and lessons learned. Employees receive ongoing technical, methodological and interpersonal training so that projects can be delivered efficiently, reliably and to a high standard of quality.

How does integrated design reduce design errors?

Through parallel, interdisciplinary work and model-based coordination, inconsistencies become visible early. Conflicts are identified and resolved before construction, which significantly reduces errors.

Why is integrated design worth it for owners?

Clients benefit from less complexity, clear accountability, faster decision-making and shorter project schedules. BHM assumes organizational coordination so that clients can focus on substantive decisions.

Which industries benefit most from integrated design and BIM?

Large industrial projects, power plants, transportation projects and infrastructure projects benefit the most. Complex utility and logistics projects are also delivered more efficiently, more safely and with greater cost transparency.

How does BHM integrate external designers and subject-matter experts?

Process and plant engineers, logistics planners and consultants are involved at an early stage. This creates a consistent, cross-disciplinary overall design approach that efficiently brings all disciplines together.

What long-term benefits does BIM provide?

BIM ensures transparency, design accuracy and cost certainty throughout all project phases. It enables digital documentation for operations and maintenance and supports decision-making throughout the entire life cycle of complex construction projects.