Integrated design
Integral design – because the whole is more than the sum of its parts
We work in interdisciplinary teams and design in a digital model. We continuously develop our BIM methodology and use it to strengthen our integrated collaboration.
By working together – both digitally and in person – we significantly increase efficiency, reduce handoff losses and minimize design and coordination errors.
Beyond our core disciplines, we bring in process and equipment planners, logistics specialists and external experts early. This ensures all design topics are integrated into one consistent, cross-disciplinary overall plan.
Our methods
- Central project leadership (single point of responsibility)
- Interdisciplinary project teams
- Cross-location resource and know-how management recommendations and actions as needed
- BIM-based integration models
- Common Data Environment (CDE) as the central data source
- Model-based coordination and clash detection
- Concurrent engineering (parallel design)
- Standardized processes for managing information
- Phase- and model-based information requirements
- Coordination and integration loops
- Clearly defined decision and approval processes
- Cross-location knowledge management
- With best practices, industry know-how and lessons learned
- Industry- and project-specific standards
- Holistic employee development through technical, methodological and interpersonal training
Your benefit
Parallel, interdisciplinary work across all disciplines reduces rework cycles, eliminates waiting time and speeds up decisions throughout the design process.
Integrated collaboration in a shared model makes inconsistencies between disciplines visible early. Conflicts are systematically identified and resolved before implementation.
We approach our projects hollistically – from day one. At BHM, Integrated design combines technical and industry expertise, leadership and digital methodes to deliver measurable value for our clients.
Frequently asked questions about
integrated design and BIM
Integrated design means that architecture, structural engineering, building systems and infrastructure are coordinated from the outset as a single, integrated service. All disciplines work in parallel within interdisciplinary teams under centralized project leadership in order to maximize efficiency, quality and safety in complex construction projects.
Integrated design minimizes interface losses, identifies design errors early and shortens project timelines. Clients benefit from clear accountability, efficient coordination and measurable value throughout the entire design process.
BIM is a digital building information model that connects architecture, structural engineering, building systems, and other disciplines. BIM enables model-based, interdisciplinary collaboration, reduces errors and increases efficiency on large projects.
BIM creates a shared 3D model for all disciplines in which conflicts can be identified and resolved early. It improves transparency, design accuracy and coordination among architecture, engineering and infrastructure.
BIM provides a static, intelligent building model with geometry, materials, cost data and schedule information. A digital twin builds on this and uses real-time data, monitoring and simulation for operations and life-cycle management.
In these types of projects, BIM enables early simulation of all technical systems, from piping and energy supply to transportation and logistics systems. This reduces rework, optimizes cost and construction schedules and identifies conflicts between disciplines early.
BHM works with BIM-based integration models and a Common Data Environment (CDE). Model-based coordination and clash detection ensure that all disciplines access current, approved data and that conflicts are resolved at an early stage.
Specialized engineering services are developed in parallel using concurrent engineering. Standardized processes, integration loops and clear approval milestones reduce errors, ensure model quality and accelerate decision-making on complex construction projects.
Central project leadership manages all disciplines and partners, consolidates decisions and handles escalations. Clients have a single point of contact, which significantly simplifies coordination.
BHM builds its expertise in integrated design through cross-location knowledge management, best practices and lessons learned. Employees receive ongoing technical, methodological and interpersonal training so that projects can be delivered efficiently, reliably and to a high standard of quality.
Through parallel, interdisciplinary work and model-based coordination, inconsistencies become visible early. Conflicts are identified and resolved before construction, which significantly reduces errors.
Clients benefit from less complexity, clear accountability, faster decision-making and shorter project schedules. BHM assumes organizational coordination so that clients can focus on substantive decisions.
Large industrial projects, power plants, transportation projects and infrastructure projects benefit the most. Complex utility and logistics projects are also delivered more efficiently, more safely and with greater cost transparency.
Process and plant engineers, logistics planners and consultants are involved at an early stage. This creates a consistent, cross-disciplinary overall design approach that efficiently brings all disciplines together.
BIM ensures transparency, design accuracy and cost certainty throughout all project phases. It enables digital documentation for operations and maintenance and supports decision-making throughout the entire life cycle of complex construction projects.